TY  - JOUR
T1  - Estimation Procedure of Industrial-Engineering Communication (IEC)
AU - Safina, A.A. AU - Nikiforova, E.G. AU - Shakirova, D.S. 
JO  - International Business Management
VL  - 10
IS  - 23
SP  - 5559
EP  - 5563
PY  - 2016
DA  - 2001/08/19
SN  - 1993-5250
DO  - ibm.2016.5559.5563
UR  - https://makhillpublications.co/view-article.php?doi=ibm.2016.5559.5563
KW  - Industrial-engineering communication
KW  -technological conversion
KW  -vertical integration
KW  -transaction cost
KW  -effectiveness
KW  -functional analysis
KW  -cooperation
KW  -enterprise value
AB  - This study has summarized some aspects of industrial-engineering communication estimation procedure. It has shown up faults of such effectiveness research methods as industrial analysis ratio forming part of the communication, game theory, input-output balancing. There has been proved the method industrial-engineering communication estimation procedure. The method consists of qualitative analysis of industrial-engineering communication and its effect on the level of transaction cost and enterprises value, effectiveness of such communication from the view of social and infrastructural development. Mathematical method is based on the functional analysis and calculating the flexibility of transaction cost function which are formed in the result of the industrial-engineering communication development.
ER  - 