T1  - Design and Construction of a 5 kW Turbine for a Proposed Micro Hydroelectric Power Plant Installation at Awba Dam University of Ibadan
AU - Ismail, O.S. AU - Ajuwape, T. 
JO  - International Journal of Electrical and Power Engineering
VL  - 5
IS  - 3
SP  - 131
EP  - 138
PY  - 2011
DA  - 2001/08/19
SN  - 1990-7958
DO  - ijepe.2011.131.138
UR  - https://makhillpublications.co/view-article.php?doi=ijepe.2011.131.138
KW  - outflow
KW  -water tanker
KW  -pumps
KW  -hydro
KW  -turbines
KW  -Dam
KW  -Nigeria
AB  - The designand construction of a 5 kW turbine for a proposed micro hydroelectric power plant installation at Awba Dam University of Ibadan was undertaken. Dam outflow rate and the average head of outflow were determined using a topographical survey of the dam and pertinent calculations. For selection of a suitable turbine from available options (Francis, Kaplan and Pelton), a selection matrix was used with compliance with turbine selection chart, affordability, ease of local constructionand long term cost effectiveness and suitability for expected working-speed range as the selection criteria. The various designed parts were constructed and assembled locally and the turbine was tested using both an elevated tap (a height of 4 m and a flow rate of about 0.00051 m<SUP>3</SUP> sec<SUP>-1</SUP>) and a water tanker at a flow rate of about 0.00214 m<SUP>3</SUP> sec<SUP>-1</SUP>. Results showed that Francis turbine was most suitable. Turbine inlet tip angle of 59&deg;, turbine outlet tip angle of 47&deg;, turbine runner outer diameter of 22 cm and inner diameter of 11 cm and a wicket angle of 22&deg; were obtained. These values were used for constructing the turbine. Tests performed using the tap showed that the turbine worked at an average rotational speed of 110 rev min<SUP>-1</SUP> while it worked at an average speed of 300 rev min<SUP>-1</SUP> when it was tested using the water tanker. This showed that the turbine speed increased with increased water flow rate. A 5 kW Francis turbine for micro hydro installation at Awba dam has been designed and constructed. The turbine worked smoothly.