T1  - A Theoretical Framework on Factors Causing Delay of Construction
Industries Projects
AU - Al-Fadhali, Najib AU - Zainal, Rozlin 
JO  - The Social Sciences
VL  - 12
IS  - 3
SP  - 393
EP  - 399
PY  - 2017
DA  - 2001/08/19
SN  - 1818-5800
DO  - sscience.2017.393.399
UR  - https://makhillpublications.co/view-article.php?doi=sscience.2017.393.399
KW  - Factors
KW  -delays
KW  -construction projects
KW  -associated
KW  -parameter
AB  - Time is one of the main important elements which should be taken into consideration during
implementation of construction industry projects and project management life cycle as a whole and can be
considered as one of the most significant parameters of a project and the main critical factor that determines
the success of the project. The objective of this study is to propose the theoretical framework that causes
construction projects delay in Yemen. The causes of delay were collected from the prior international journal
papers. Time delay is a very recurrent phenomenon and is nearly associated with almost all constructing
projects. However, little effort has been made to amputate the phenomenon. Delay can be defined as time
overrun or expansion of time to accomplish the project. Construction delay cannot be avoided especially in
government facilities in Yemen. Therefore, delay is a case when the actual work of a construction project is
slower than the planned schedule or late accomplishment of the projects. The review of literature in relation to
causes of delay in construction projects can be summarized under 3 main headings namely: delay caused by
contractor, delay caused by acts of God and delay caused by consultant. These 3 variables form the framework
upon which this review is based.