T1  - A Frequency Recovery Effect by Operating Battery Energy Storage
System in Transient State in the Power System
AU - Lee, Hyun-Chul AU - Lee, Hui-Bae AU - Roh, Yong-Gi AU - Jung, Byoung-Jo 
JO  - Journal of Engineering and Applied Sciences
VL  - 13
IS  - 1
SP  - 27
EP  - 31
PY  - 2018
DA  - 2001/08/19
SN  - 1816-949x
DO  - jeasci.2018.27.31
UR  - https://makhillpublications.co/view-article.php?doi=jeasci.2018.27.31
KW  - state
KW  -study
KW  -energy storage system
KW  -reserve power
KW  -AGC operation
KW  -GFC operation
AB  - The purpose of this study is operating the Battery Energy Storage System (BESS) to securing the
reactive power. The BESS has been maintained power voltage value to rapidly response speed for steady state
in the power system. The power system has been used the BESS for the frequency recovery in transient state.
This study was analyzed by operating the BESS in the power system. The BESS was installed that the power
quality necessary of high level for the Governor Free Control (GFC) and Automatic Generation Control (AGC)
operation in the power system. The BESS was evaluated to compare the real power system with simulation
power system in fault state (outage of large scale power capacity). It would be stable operation by load
fluctuation in the power system. The simulation result, it should be used for expended application of the BESS
in the power system as stable power supply and low load fluctuation.