TY  - JOUR
T1  - Technical Feasibility of a Micro Hydro Installation
AU - Adeyanju, A.A. 
JO  - Journal of Engineering and Applied Sciences
VL  - 4
IS  - 5
SP  - 324
EP  - 334
PY  - 2009
DA  - 2001/08/19
SN  - 1816-949x
DO  - jeasci.2009.324.334
UR  - https://makhillpublications.co/view-article.php?doi=jeasci.2009.324.334
KW  - Analyze
KW  -technical
KW  -feasibility
KW  -hydroelectric
KW  -scheme
KW  -turbine
AB  - The purpose of this study is to analyze the technical feasibility of a micro hydro installation and the principles of extracting electricity from a water source and the types of hydroelectric schemes used. This continued with the investigation into an understanding of the technology and the components required completing a hydroelectric system, these included the various types of turbine, mechanical plant and civil works. By performing this literature review, it was made clear what information and components would be required and how the overall performance could be calculated.
ER  - 