TY  - JOUR
T1  - Development of Model for Determination of Crew-Size Requirements for a Bolt and Nut Manufacturing Industry
AU - , K.A. Adebiyi AU - , L.O. Mudashiru AU - , A.O. Ajayeoba 
JO  - Journal of Engineering and Applied Sciences
VL  - 2
IS  - 12
SP  - 1782
EP  - 1785
PY  - 2007
DA  - 2001/08/19
SN  - 1816-949x
DO  - jeasci.2007.1782.1785
UR  - https://makhillpublications.co/view-article.php?doi=jeasci.2007.1782.1785
KW  - Man-hours
KW  -efficiency
KW  -production time
KW  -crew size
KW  -bolt and nut
AB  - Effective and efficient running of bolt and nut manufacturing industry demands determination of it’s optimal crew-size requirement. In this study, a model was developed to determine the number of manpower required (Q) in terms ofannual production target (µ); production efficiency (P) machine efficiency (P o) and operators efficiency (P m); expected number of required man-hours (N) and the total production time (T). Data were collected from Oyeladun Manufacturing Industry, Ogbomoso Oyo State on types and number of machine tools available; working hours per day; number of working days per week. The model parameters were estimated as follows µ (52,240), P (85%) and N (0.1877). The optimal number of personnel required by the organization was estimated to be six.
ER  - 