@article{MAKHILLIJSC20061220757,
    title = {Analysis of Real World Personnel Scheduling Problem: An Experimental Study of Lp-Based Algorithm for Multi-Time Multi-period Scheduling Problem for Hourly Employees},
    journal = {International Journal of Soft Computing},
    volume = {1},
    number = {2},
    pages = {143-148},
    year = {2006},
    issn = {1816-9503},
    doi = {ijscomp.2006.143.148},
    url = {https://makhillpublications.co/view-article.php?issn=1816-9503&doi=ijscomp.2006.143.148},
    author = {Sang Hyun Kim},
    keywords = {Linear problem,multi-time multi-period problem,scheduling problem},
    abstract = {Scheduling service employees at any campus dining center is not an easy task for a manager because
most positions at a campus dining center are hourly-paid positions, leading to a high employee turnover and
many uncertainties. In such a circumstance, a manager has a hard time to organize and project employees’ work
schedules. The Johnson Commons (JC) dinning center at the University of Mississippi operated by Aramark
also has similar difficulties in scheduling its hourly employees. After discussing with a manager and
investigating the current scheduling system at the JC, it is found that the JC has one type of scheduling
problem called the Multi-time Multi-Period Scheduling Problem. Therefore, the main purpose of this study is
to find the optimal solution for the scheduling problem at the JC dining center. The result shows that with the
optimal solution, the JC can save a total of $50,648.00 hourly employee labor expenses per year.}
    }