O.S. Ismail, T. Ajuwape,
Design and Construction of a 5 kW Turbine for a Proposed Micro Hydroelectric Power Plant Installation at Awba Dam University of Ibadan,
International Journal of Electrical and Power Engineering,
Volume 5,Issue 3,
2011,
Pages 131-138,
ISSN 1990-7958,
ijepe.2011.131.138,
(https://makhillpublications.co/view-article.php?doi=ijepe.2011.131.138)
Abstract: The designand construction of a 5 kW turbine for a proposed micro hydroelectric power plant installation at Awba Dam University of Ibadan was undertaken. Dam outflow rate and the average head of outflow were determined using a topographical survey of the dam and pertinent calculations. For selection of a suitable turbine from available options (Francis, Kaplan and Pelton), a selection matrix was used with compliance with turbine selection chart, affordability, ease of local constructionand long term cost effectiveness and suitability for expected working-speed range as the selection criteria. The various designed parts were constructed and assembled locally and the turbine was tested using both an elevated tap (a height of 4 m and a flow rate of about 0.00051 m3 sec-1) and a water tanker at a flow rate of about 0.00214 m3 sec-1. Results showed that Francis turbine was most suitable. Turbine inlet tip angle of 59°, turbine outlet tip angle of 47°, turbine runner outer diameter of 22 cm and inner diameter of 11 cm and a wicket angle of 22° were obtained. These values were used for constructing the turbine. Tests performed using the tap showed that the turbine worked at an average rotational speed of 110 rev min-1 while it worked at an average speed of 300 rev min-1 when it was tested using the water tanker. This showed that the turbine speed increased with increased water flow rate. A 5 kW Francis turbine for micro hydro installation at Awba dam has been designed and constructed. The turbine worked smoothly.
Keywords: outflow;water tanker;pumps;hydro;turbines;Dam;Nigeria